St.-Jürgen-Church, Heide

View from south-east
Description:Renovation of the church
Building time:2017 – 2023
Assignment:
  • Renovation of ceiling beams
  • Planning of an emergency reinforced concrete staircase

Wasserkunst, Wismar

Wasserkunst, Wismar
Wasserkunst, Wismar
Description:Determination of the load-bearing capacity of the ceiling and substructure
Building time:2023 – dato
Assignment:
  • Analysis of the supporting structure based on historical documents
  • Static evaluation of the supporting structure
Top WordPress Cookie Notice by Real Cookie Banner